1、上操作平台搭设与模板上口齐平,用于堆放材料和工具,绑扎仓壁水平的钢筋和竖向以及模板上浇捣砼,是主要操作平台,以便竖立钢筋的稳固和支承杆的接长,可在提升架横梁上加设两根钢管作为连杆。
2、支撑杆的两头作为丝口接头,一头车成直径16毫米的螺杆长30MM,另一头车成M16的螺母,深35MM,为避免接头在同一截面,底层支撑杆长度采用ZM、3M、4M三种规格间隔布置。

提交回答
好评回答
  • 2005-02-22 17:54:15
      1。	The upper operating platform shall be placed at the same level of the upper edge of the mould board for the purpose of piling materials and tools, the main operating platform is for pouring and stirring the concrete, and for the steel bars that are both horizontal and vertical and are for binding the walls of the concrete storage。
       This kind of arrangement is for convenience of fixing of vertical steel bars and of extending bearing poles; and two more steel pipes can be added onto the beam of the elevation frame as connection pipes。
       2。 The two ends of the bearing pole are the screw joints: one end is to be lathed to as a screw of φ16mm and L=30mm; the other end is as a nut of M16 and depth=35mm。
       And avoiding all the joints placed on the same section, the bottom bearing poles shall be adopted in three length scales (2M, 3M, and 4M) with interval distribution。
       。

    笨***

    2005-02-22 17:54:15

类似问题

换一换
  • 外语学习 相关知识

  • 教育培训
  • 教育考试

相关推荐

正在加载...
最新问答 推荐信息 热门专题 热点推荐
  • 1-20
  • 21-40
  • 41-60
  • 61-80
  • 81-100
  • 101-120
  • 121-140
  • 141-160
  • 161-180
  • 181-200
  • 1-20
  • 21-40
  • 41-60
  • 61-80
  • 81-100
  • 101-120
  • 121-140
  • 141-160
  • 161-180
  • 181-200
  • 1-20
  • 21-40
  • 41-60
  • 61-80
  • 81-100
  • 101-120
  • 121-140
  • 141-160
  • 161-180
  • 181-200
  • 1-20
  • 21-40
  • 41-60
  • 61-80
  • 81-100
  • 101-120
  • 121-140
  • 141-160
  • 161-180
  • 181-200

热点检索

  • 1-20
  • 21-40
  • 41-60
  • 61-80
  • 81-100
  • 101-120
  • 121-140
  • 141-160
  • 161-180
  • 181-200
返回
顶部
帮助 意见
反馈

确定举报此问题

举报原因(必选):