汇集大家智慧,帮我英翻中!
The C shall ensure that the equipment and materials once rejected by the Inspection Engineer, are not re-used in the fabrication of the pot shell assembly. Where parts rejected by the Inspection Engineer/ Nominated Agency have been rectified as per agreed procedures laid down in advance, such parts shall be segregated for separate inspection and approval, before being used in the work. After the rectification job also, during re-inspection, if it is found that the same item is still in non-conformance with the desired inspection results, the same shall be rejected and can not be used anywhere.
The C shall ensure that the equipment and materials once rejected by the Inspection Engineer, are not re-used in the fabrication of the pot shell assembly。
Where parts rejected by the Inspection Engineer/ Nominated Agency have been rectified as per agreed procedures laid down in advance, such parts shall be segregated for separate inspection and approval, before being used in the work。
C应确保一旦有设备或原料被检验工程师认定为不合格产品,则这些产口便不能在罐子的装配过程中再次使用。被检验工程师/指定代理处所认定的零件为次品时,应按照双方同意的,事先归定的程序进行矫正。在用于装配之前,此种零件应从其它零件中隔离开来单独检验及审批通过。
After the rectification job also, during re-inspection, if it is found that the same item is still in non-conformance with the desired inspection results, the same shall be rejected and can not be used anywhere。
而且在矫正工作完成后,在重新检验中发现与预期的检验结果不一致时,该零件将被当作次品,且不能在任何工序中使用。
答:1.The front office is usually the first direct contact a guest makes with the ho...详情>>
答:I haven't window molding catalogs on hand. catalogs 产品目录 haven't ~ something ~ o...详情>>
问:head+hand+hardworking=success 什么意思
答:head+hand+hardworking=success 脑+动手+努力工作 = 成功详情>>